Your drawings in.
A P6 baseline out.
For schedulers on US public works. BuiltWiz reads the drawings, specs and site safety plan, drafts a CPM baseline that imports and runs in Primavera P6, then keeps it current from daily progress. Your team reviews and approves every step.
Your best schedulers spend their hours typing.
Every new project starts with weeks of reading sheets and keying activities into P6. Every month, the same projects need progress re-entered. Growth means hiring.
Per baseline, by hand
Reading hundreds of sheets and specs to build activities, logic and durations before the real thinking starts.
The same data entry
Chasing progress that arrives late or on paper, then re-keying percentages and durations for every client.
For every few new clients
Capacity is capped by headcount, so senior people stay stuck on entry instead of analysis and client advice.
From document set to approved baseline.
Your team stays in charge of the schedule. BuiltWiz does the first draft and the repetitive updates.
Upload the documents
Drawings, specs and the site safety plan, as the owner issued them.
PDF · ExcelAI drafts the baseline
Activities, logic, phasing and durations, organised the way a scheduler would build them.
CPM draftYour scheduler reviews
Edit anything, ask the AI for changes, then move it from Ready to Review to Approved.
Review → ApproveExport to P6
A native .XER that imports and runs in Primavera P6, ready for the agency submission.
.XERBuilt around how schedulers already work.
Update with AI. You approve every change.
Ask in plain English. BuiltWiz proposes a plan and shows what it affects downstream. Nothing changes until you approve, and every edit is a revision you can roll back.
See it on a callP6 and Excel, in and out
Import an existing XER or Excel schedule, export native XER. No new formats for the agency.
Learn moreMonthly updates from daily progress
Progress in, update drafted, forecast reprojected. Your time goes on review, not re-keying.
Learn moreA review workflow
Ready to Review, then Approved or Rejected, with a trail of who approved what.
Made for public works
Built around agency requirements for P6-importable CPM schedules, not generic project software.
Narrative reports
Coming nextThe monthly narrative, assembled from schedule changes, RFIs and comments. In development, not included today.
More clients, same team.
A reviewed draft on day one instead of a blank P6 project.
Updates arrive drafted. Your scheduler checks and signs off.
Senior time moves to analysis, delay risk and client advice.
These are our targets from early projects, not guarantees. We'll measure them with you during the pilot.
It's not perfect yet. Here's exactly where it stands.
We'd rather you hear it from us. Every schedule still gets expert review, and that's by design.
What the expert review caught
- Missing pre-construction work: permits, submittals, shop drawings, deliveriesfixing now
- No phasing on phased projectsfixing now
- Some repeated activities, and no closeout tasksfixing now
- Durations that read as optimisticfixing now
Built from inside the industry.
We run public-works jobs in New York, and we build software at scale. BuiltWiz is the scheduler we wanted to buy and couldn't find, so we're building it together with the people who use it.
We're working closely with 5 scheduling firms.
Help shape the product while it's early. You get the tool and a direct line to the people building it.
- Free access during the pilot
- Baselines on 1–2 of your projects
- Fortnightly review with the founders
- Design-partner pricing if you continue
- Apply as a design partnerTakes a minute. We reply within one business day.
What schedulers ask us first.
Does this replace my schedulers?+
No. It removes the data entry so your schedulers spend their time on logic, review and client advice. Every schedule is reviewed and approved by a person.
Will the schedule import cleanly into P6?+
Yes. BuiltWiz exports a native .XER file that imports and runs in Primavera P6. You can also bring in existing XER or Excel schedules.
How accurate is it?+
About 80% overall today on a real public project, with 90–95% of activities found. That's why every baseline goes through your review before it's used. We're fixing the gaps the experts found (see above).
What happens to our project data?+
It stays confidential and is never shared. We're finishing our production setup (US hosting and backups) before taking live project data, so early pilots run on past or sample projects.
Which projects does it work best on?+
US public-works projects that require a P6 CPM schedule: schools, transit, municipal and agency work. Tell us about yours on the call.
How is it priced?+
Per project, the same way you bill your clients: a baseline fee plus a monthly fee per project being updated. Design partners get early pricing. We'll walk through it on the call.
See your drawings become a baseline.
A 30-minute walkthrough on a sample project. Bring questions, bring skepticism. No slides, no pressure.
Thanks. We've got it.
We'll email with times for your walkthrough.
- Request receivedJust now.
- We email you timesWithin one business day, from a founder.
- 30-minute walkthroughOn a sample project. Bring your questions.